CE
Chris Explains AI
Command Center
Last regenerated 2026-05-27 22:29 CDT
--:--:--
 
Dallas · +79°F Partly cloudy
Soft launch
35
days to launch
Activity pulse
21
entries in last 14 days
Day streak
3
longest 3 · logged today
AI sessions
44
16 today · rolling 7 days
View →

Track board workstreams by focus tier

Active focus2
Launch track CRITICAL
Phase 1: Funnel
5%Last touched 2026-05-26
Next: Phase 1 kickoff: Cloudflare Pages + GitHub + MailerLite account setups, then Astro landing page scaffold (screenshot-design loop).
Phase progress · 4 phases
Phase 0: Pre-launch polish 6/6 · 100%
  • ✓ Brand and logo final review
  • ✓ CE monogram and full asset suite (16 SVGs, 16 PNGs)
  • ✓ Brand guide locked
  • ✓ Lead magnet content final pass (universal prompt template)
  • ✓ Lead magnet PDF formatting + reusable PDF template (HTML/CSS + Playwright, supersedes Word template)
  • ✓ Polished lead magnet PDF ready for distribution
Phase 1: Launch the funnel 2/11 · 18%
  • ✓ Cloudflare Pages account created (stood up during cockpit deploy 2026-05-26)
  • ✓ GitHub account / repository set up (chrisexplainsai org + cockpit repo exist; landing-page repo still TBD)
  • ○ MailerLite account created
  • ○ Astro project scaffolded
  • ○ Landing page hero and copy draft 1
  • ○ Email capture form wired to MailerLite
  • ○ Lead magnet auto-delivery on signup
  • ○ Welcome email sequence (3-5 emails)
  • ○ Newsletter opt-in checkbox in signup form
  • ○ Site live at chrisexplainsai.com
  • ○ First real (non-Chris) email subscriber
Phase 2: Content engine 0/8 · 0%
  • ○ Publer account setup
  • ○ Image templating script (Python + Pillow) working end-to-end
  • ○ First Figma carousel template designed
  • ○ Twitter/X-via-Grok content research workflow operational
  • ○ First batch of 7 days of posts scheduled
  • ○ First short-form video published (TikTok / Reels / Shorts)
  • ○ 2 weeks of consistent posting hit
  • ○ First 100 followers across primary platforms
Phase 3: Course delivery 0/8 · 0%
  • ○ Supabase Auth set up
  • ○ Stripe account verified
  • ○ Course content migrated to Astro content collections
  • ○ Member-only middleware in place
  • ○ Member dashboard design
  • ○ Video hosting decision and account
  • ○ Payment flow tested end-to-end
  • ○ First paying customer
Notes
Phase 0 COMPLETE 2026-05-26 (brand + lead magnet PDF + reusable PDF template shipped; tagline finalized; Cloudflare account stood up during cockpit work). Phase 1 starts with account setups + Astro scaffold.
Idea Factory (SYSTEM-VISION Layer A)
Building
75%Last touched 2026-05-27
Next: Answer Gate 1 questions for the video-reverse-engineer live test (in the decision queue), then resume the pipeline. Code-review + qa pass on factory.py finishing.
Notes
Chris promoted this to build now at full scope (pipeline + dashboard) 2026-05-27, overriding the launch-first ordering. Idea Bank (the store) is live with 15 ideas. Chunk 1 shipped: ideas/ scaffold + state.json schema, factory-queue.json, idea-bank.json schema extended.
Recently done5
Command Center dashboard (v1)
v1 shipped
100%Last touched 2026-05-26
Next: v2 ideas tracked in the plan file. No active work; revisit after launch.
Notes
All 6 steps done 2026-05-26. Code-reviewer PASS WITH NOTES (fixes applied), qa 61/61 pass. v2 deferrals: auto-derive last_touched from tagged log entries; pull real multi-window-payoff % into the AI snapshot card.
Claude Code infra deepening
Complete
100%Last touched 2026-05-27
Next: No next action set.
Notes
All 5 chunks done. E + F + G + H shipped 2026-05-26. Chunk I (Personal/ workspace at C:\Users\chris\Documents\Personal\) shipped 2026-05-27 — folder scaffold, CLAUDE.md, HANDOFF.md, travel/reference/HOWTO.md, .gitignore, forest-green VS Code theme. Anthropic 2FA confirmed enabled 2026-05-27.
Overnight research run (competitor + audience)
Complete
100%Last touched 2026-05-26
Next: Pull from competitors/_summary.md + pain-points/_themes.md for Phase 1 landing-page copy + lead magnet positioning.
Notes
Ran end-to-end 2026-05-26. 235 verbatim audience quotes + 20 competitor deep dives + 2 strategic synthesis files. ~35 min compute, 12 parallel Sonnet sub-agents. Recurring observation: nobody complains about AI cost — only effectiveness, identity, job security. Strong positioning signal for Architect Method.
Course content (The Architect Method)
Final draft complete
100%Last touched 2026-05-25
Next: No content work until Phase 3 (delivery build).
Notes
10 modules, full final draft. Lead magnet (universal prompt template) content also complete (still needs PDF formatting, tracked under launch-track).
Brand Phase 0 (logo + asset suite)
Complete
100%Last touched 2026-05-25
Next: No further brand work until launch posts call for new templated assets.
Notes
CE monogram, full asset suite (16 SVGs + 16 PNGs), tagline, descriptor, color palette, typography all locked.

Insights rule-based, all-time

info
Dominant focus: Infra/CC with 16 of 20 tagged entries (80%).
If this matches your stated priority, good. If not, the day-to-day pull is away from the top of the plan.
info
Peak hour: 11p with 7 entries.
If this is outside your day-job window, you've found your deep-work block. Defend it on the calendar.
claude
In-progress phases on the launch track: Phase 1: Launch the funnel.
Either check items off in phases.md, prune what's no longer planned, or move stalled items to a backlog.

Activity, last 30 days

When you work last 8 weeks

12a
3a
6a
9a
12p
3p
6p
9p
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Dashed boxes mark off-hours (outside Mon-Fri 9am-5pm).

Tag breakdown all-time

1
16
3
1
Phase 0Infra/CCDecisionOther

Recent activity last 5

2026-05-27 21:25
Infra/CC[INFRA] Command Center tabs header-consistent
Unified the headers across all four cockpit tabs. [research-index.html](command-center/research-index.html) and [ai-engagement-dashboard.html](command-center/activity-log/ai-engagement-dashboard.html) now match [index.html](command-center/index.html) and [factory.html](command-center/factory.html): CE logo + "Chris Explains AI" brand + dash-name on the left, live clock + date + Dallas weather on the right. Research dash-name corrected from "Research Reports" to "Research". Changes made in the generators ([build-research-index.py](command-center/build-research-index.py), [build-ai-engagement-dashboard.py](command-center/activity-log/scripts/build-ai-engagement-dashboard.py)) so future republishes preserve the look.
2026-05-27 21:25
Infra/CC[INFRA] /sync reworked as end-of-day cleanup
Evolved [.claude/skills/sync/SKILL.md](.claude/skills/sync/SKILL.md) from a dashboard-reconciliation pass into an end-of-day cleanup command. Added bedtime trigger phrases ("I'm going to bed", "sync everything up", "wrap it up for tomorrow"), HANDOFF.md reconciliation (remove items the logs prove are done; does NOT regenerate the file — that's /handoff's job), ask-before-changing mid-flow when uncertain, plus a new scan step that surfaces Idea Factory items parked at a human gate and learning/build-candidates.md entries whose trigger is now met. /sync and /handoff remain distinct commands.
2026-05-27 21:23
OtherHandoff: Track B planning done, slide template is next
Updated [HANDOFF.md](HANDOFF.md): Active focus rewritten so the Track B opener now points at the master slide template as the first production step. Track B planning entry added under "Done this session" with the full decision summary (pricing, delivery shape, tooling, asset inventory). Spec is at [course/format-spec.md](course/format-spec.md).
2026-05-27 21:22
Decision[DECISION] Track B course format spec locked
Track B planning session ended with [course/format-spec.md](course/format-spec.md) locked end to end. Pricing decided: **$229 waitlist / $279 post-launch** (was undecided). Delivery shape: ~110 per-section videos with a next-button UX (~80 section videos + 22 face-only module intro/outro + 8-12 demo videos), ~5.7-6.0 hr total runtime at Chris's measured 150 wpm pace. Format: Loom-style webcam-in-corner over slides, draft IS the script with a light pre-record edit pass for slide/demo cues only. Tooling locked: slides via python-pptx → upload .pptx to Google Slides, Speakflow floating teleprompter pinned under the webcam, two-stage edit pipeline (Claude runs ffmpeg batch preprocessing for trim/normalize/encode/Whisper captions, Chris does creative cuts in CapCut). Mic still open (Chris will pick; Shure MV7 default recommendation). Asset inventory rewritten to match what the course actually contains (zero fully-written worked prompts in the draft, only structural skeletons and labeled examples): 17 per-section reference-card downloads, Master Reference Pack PDF, Module Summaries PDF, sales trailer video, welcome email video, sample-lesson preview. No case studies, no practice tasks, no community at launch. Section 6.9 (13.2 min) stays as one video. Slide density loosened from "headline + 3 lines max" to content-adaptive (bullets, tables, prompt snippets, diagrams allowed); slide-and-script pairing built into the deck-plan format. Next concrete step (separate chat): design the master slide template, 8-12 worked sample slides covering all 5 patterns + brand colors + webcam safe-zone.
2026-05-27 20:53
Infra/CC[INFRA] Idea Factory complete - first run shipped, hardening done
First real Factory run completed end-to-end on `video-reverse-engineer`. Gate 1 closed with locked answers in [clarify.md](ideas/video-reverse-engineer/clarify.md); 4 parallel Sonnet researchers wrote dimension files synthesized into [research.md](ideas/video-reverse-engineer/research.md); 5-persona stochastic-consensus eval + Opus synth produced [evaluation.md](ideas/video-reverse-engineer/evaluation.md) (4-1 build-later, 68/100); Chris redirected on new "about-to-start-posting" context; second round wrote [evaluation-v2.md](ideas/video-reverse-engineer/evaluation-v2.md) (4-1 build-now, 77/100, full inversion with 3 personas flipping on merits and devil's-advocate holding); detailed Opus plan at [plan.md](ideas/video-reverse-engineer/plan.md) (~6,200 words, implementation-spec depth, claude -p locked as the synthesis mechanism). Parked at Gate 3 awaiting Chris's call to build. Also shipped: dedicated Idea Factory tab [factory.html](command-center/factory.html) on the cockpit with unified pages-nav across all 4 dashboards (Command Center / Idea Factory / AI engagement / Research); active tab highlighted indigo. Factory SOP updates: Gate 2 auto-pass rule (score ≥ 70 -> straight to plan), detailed-plan spec for all future plans, Expand-skip allowance when Gate 1 locks scope, Gate-redirect protocol (context-update + v2 personas + v2 synthesizer). Bug fix: [factory.py](scripts/factory/factory.py) `cmd_gate_open` now idempotent on both state and queue halves; resolves the `set stage awaiting-*` -> `gate-open` collision hit during this run. Publish hardening: [publish-cockpit.py](command-center/publish-cockpit.py) now sets `PYTHONIOENCODING=utf-8` on subprocess env + `errors='replace'` on decode + UTF-8 reconfigure on its own stdout, eliminating the Unicode error path on Windows. Smoke-tested kill/park path with a dummy idea, verified cockpit rendering, cleaned up. Lab notes added to [lab-notes.md](.claude/rules/lab-notes.md): 2 anti-patterns (the gate-open collision + sub-agent prompts must include prior-file anchor when running redirects), 2 validated patterns (stochastic-consensus + redirect-rescore worked first try, Expand-skip when scope is locked). Cockpit pushed live multiple times (final commit c355a4e). Factory declared ready by Chris.