Chris Explains AI
Command Center
Last regenerated May 31, 9:41 pm
--:--:--
 
Dallas · +90°F Sunny
Soft launch
31
days to launch
Activity pulse
38
entries in last 14 days
Day streak
7
longest 7 · logged today
AI sessions
87
9 today · rolling 7 days
View →

Track board workstreams by focus tier

Active focus3
Chris Builds AI (agency) CRITICAL
Phase 0 — build pre-customer
40%Last touched 2026-05-30
Next: Sales site v1 + v2 built (local, not deployed). Next: rename site copy/nav from 'Architect Agency' to 'Chris Builds AI', run code-review + QA, swap in the real demo dashboard, then deploy and flip Railway to Hobby before driving traffic. Google Cloud OAuth (Step 0) deferred until the Tier 1 app exists.
Notes
Renamed to 'Chris Builds AI' 2026-05-30 (was 'Architect Agency'; brand architecture in BUSINESS-PLAN.md — Chris Explains AI = education, Chris Builds AI = done-for-you, verb pair). Site rename pending before deploy. Two-tier productized AI agent agency. Tier 1 LITE $197 one-time, Tier 2 FULL $597-797 + $150/mo. Step 1 (auto-proposal pipeline) COMPLETE 2026-05-29: all 4 accounts wired (Supabase + Resend domain-verified + Firecrawl free tier + Railway), worker deployed from private repo chrisexplainsai/agency-worker and verified processing a real lead end-to-end from the cloud (claim -> Firecrawl scrape -> awaiting-draft -> Resend ping). /draft-proposal dry run passed. Sales site v1 (/agency) + v2 (/agency-v2) built locally, plus a clickable demo dashboard (Chris-approved). Railway on FREE TRIAL ($5/30 days) — flip to Hobby before agency marketing starts. Google Cloud OAuth (Step 0) deferred until Tier 1 app exists; runbook + form copy + 120x120 consent logo prepped.
Content engine (build-in-public, both arms) CRITICAL
Unblocked, not yet started
0%Last touched 2026-05-30
Next: Kickoff on the redirected angle (BUSINESS-PLAN.md): build-in-public, agency-and-agents-led. Show Chris's real Claude Code setup + the agent systems he builds; gate the how-to. Pick the platform mix, set a light starting cadence (a few posts/week while recording, ramp to daily at launch), decide carousel tooling (Python/Pillow vs Figma).
Notes
Strategy redirected 2026-05-30: front door for BOTH arms (courses + agency). One content stream = trailer for the Claude Code courses + proof for the agency + credibility for the Architect Method. Videos lean toward the agency / agent systems Chris builds; carousels carry tips + AI updates + shorter concepts. Gating rule: show what I can do, not how I built it. Automation machinery unchanged (Python/Pillow templating, Publer, Twitter/Grok research workflow); only the content angle moved. Phase 1 funnel closed 2026-05-28.
Course ladder (Architect Method + 2 Claude Code courses) CRITICAL
Course 1 slides done; recording next
70%Last touched 2026-05-30
Next: Record The Architect Method (Chris is the bottleneck; all slide decks + teleprompter docs are done). M1-M4 approved; M5-M10 await Chris's Google-Slides review. Then build courses 2 (Claude Code Beginner) + 3 (Claude Code Advanced), neither started.
Notes
Education arm = a 3-course ladder (see BUSINESS-PLAN.md): (1) The Architect Method — prompting foundations, draft + all 11 slide decks done (engine locked, renderer-agnostic, audit-clean), recording is the next step; (2) Claude Code Beginner — not started; (3) Claude Code Advanced — system-building, shares subject matter with the agency, not started. Lead magnet content complete.
Also open1
Idea Factory (SYSTEM-VISION Layer A)
Built — running ideas
100%Last touched 2026-05-27
Next: Engine is built and live. Ideas in flight (parallel session): video-reverse-engineer at Gate 3 (final plan, awaiting Chris); micro-tools at Gate 2 (verdict, awaiting Chris). Resume per the /factory SOP.
Notes
BUILT 2026-05-27 at full scope (pipeline + dashboard), overriding launch-first ordering. Engine at ideas/_engine/factory.py + /factory skill; per-idea state under ideas/<slug>/; decision queue at command-center/data/factory-queue.json; Factory board on the cockpit. Idea Bank store live (16 ideas). Two ideas currently moving through the gates in a parallel session.
Recently done5
Launch track
Phase 1: Funnel (closed); Phase 2 next
100%Last touched 2026-05-28
Next: Phase 1 closed. Start Phase 2 (content engine + traffic) in a fresh session. Deliverability is monitor-only from here: watch Promotions placement improve as sender reputation warms over the first ~100 sends.
Phase progress · 4 phases
Phase 0: Pre-launch polish 6/6 · 100%
  • ✓ Brand and logo final review
  • ✓ CE monogram and full asset suite (16 SVGs, 16 PNGs)
  • ✓ Brand guide locked
  • ✓ Lead magnet content final pass (universal prompt template)
  • ✓ Lead magnet PDF formatting + reusable PDF template (HTML/CSS + Playwright, supersedes Word template)
  • ✓ Polished lead magnet PDF ready for distribution
Phase 1: Launch the funnel 12/14 · 86%
  • ✓ Cloudflare Pages account created (stood up during cockpit deploy 2026-05-26)
  • ✓ GitHub account / repository set up — `chrisexplainsai/site` repo created 2026-05-27
  • ✓ MailerLite account created (2026-05-27)
  • ✓ Astro project scaffolded (2026-05-27, Astro 6 + Tailwind v4)
  • ✓ Landing page hero and copy draft 1 (2026-05-27, 13 iterations → final)
  • ✓ Email capture form wired to MailerLite (2026-05-28, fetch POST to MailerLite endpoint w/ fields[name]+fields[email])
  • ✓ Lead magnet auto-delivery on signup (2026-05-28, MailerLite Automation: Waitlist join → branded HTML welcome email with PDF link)
  • ○ Welcome email sequence (3-5 emails) — 1 of N done (the welcome). Drip sequence deferred until first batch of subs.
  • ✓ Site live at chrisexplainsai.com (Cloudflare Pages, both apex + www, SSL enabled, 2026-05-28)
  • ○ First real (non-Chris) email subscriber
  • ✓ MailerLite sender domain authentication (DKIM/SPF, authenticated 2026-05-28)
  • ✓ Cloudflare Email Routing for chris@chrisexplainsai.com → gmail forward (2026-05-28)
  • ✓ MailerLite From email swapped from chrisexplainsai@gmail.com → chris@chrisexplainsai.com (2026-05-28)
  • ✓ Cloudflare Web Analytics installed (auto-injected at edge, confirmed 2026-05-28)
Phase 2: Content engine 0/8 · 0%
  • ○ Publer account setup
  • ○ Image templating script (Python + Pillow) working end-to-end
  • ○ First Figma carousel template designed
  • ○ Twitter/X-via-Grok content research workflow operational
  • ○ First batch of 7 days of posts scheduled
  • ○ First short-form video published (TikTok / Reels / Shorts)
  • ○ 2 weeks of consistent posting hit
  • ○ First 100 followers across primary platforms
Phase 3: Course delivery 0/8 · 0%
  • ○ Supabase Auth set up
  • ○ Stripe account verified
  • ○ Course content migrated to Astro content collections
  • ○ Member-only middleware in place
  • ○ Member dashboard design
  • ○ Video hosting decision and account
  • ○ Payment flow tested end-to-end
  • ○ First paying customer
Notes
Phase 0 COMPLETE 2026-05-26. Phase 1 SHIPPED end-to-end 2026-05-27 -> 28. Funnel closeout 2026-05-28 evening: From swapped to chris@chrisexplainsai.com, welcome email stripped to personal-note format, PDF re-uploaded in MailerLite, From-name set to 'Chris', subject set to 'Your prompt template', DMARC TXT record added at Cloudflare (p=none monitor mode), Cloudflare Web Analytics confirmed running (auto-injected, 142 PV / 23 visits in last 24h), recipient-facing gmail addresses swapped on Footer/privacy/terms/index, 'check Promotions' hint added to signup success state. Multi-inbox retest result: consistent Promotions placement (improvement from the spam result this morning). Reputation warmup over first ~100 sends is the remaining lever for Primary.
Command Center dashboard (v1)
v1 shipped
100%Last touched 2026-05-26
Next: v2 ideas tracked in the plan file. No active work; revisit after launch.
Notes
All 6 steps done 2026-05-26. Code-reviewer PASS WITH NOTES (fixes applied), qa 61/61 pass. v2 deferrals: auto-derive last_touched from tagged log entries; pull real multi-window-payoff % into the AI snapshot card.
Claude Code infra deepening
Complete
100%Last touched 2026-05-27
Next: No next action set.
Notes
All 5 chunks done. E + F + G + H shipped 2026-05-26. Chunk I (Personal/ workspace at C:\Users\chris\Documents\Personal\) shipped 2026-05-27 — folder scaffold, CLAUDE.md, HANDOFF.md, travel/reference/HOWTO.md, .gitignore, forest-green VS Code theme. Anthropic 2FA confirmed enabled 2026-05-27.
Overnight research run (competitor + audience)
Complete
100%Last touched 2026-05-26
Next: Pull from competitors/_summary.md + pain-points/_themes.md for Phase 1 landing-page copy + lead magnet positioning.
Notes
Ran end-to-end 2026-05-26. 235 verbatim audience quotes + 20 competitor deep dives + 2 strategic synthesis files. ~35 min compute, 12 parallel Sonnet sub-agents. Recurring observation: nobody complains about AI cost — only effectiveness, identity, job security. Strong positioning signal for Architect Method.
Brand Phase 0 (logo + asset suite)
Complete
100%Last touched 2026-05-25
Next: No further brand work until launch posts call for new templated assets.
Notes
CE monogram, full asset suite (16 SVGs + 16 PNGs), tagline, descriptor, color palette, typography all locked.

Insights rule-based, all-time

info
Dominant focus: Infra/CC with 19 of 29 tagged entries (66%).
If this matches your stated priority, good. If not, the day-to-day pull is away from the top of the plan.
info
Peak hour: 11p with 9 entries.
If this is outside your day-job window, you've found your deep-work block. Defend it on the calendar.
claude
In-progress phases on the launch track: Phase 1: Launch the funnel.
Either check items off in phases.md, prune what's no longer planned, or move stalled items to a backlog.

Activity, last 30 days

When you work last 8 weeks

12a
3a
6a
9a
12p
3p
6p
9p
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Dashed boxes mark off-hours (outside Mon-Fri 9am-5pm).

Tag breakdown all-time

2
2
1
19
5
9
Phase 0Phase 1Phase 3Infra/CCDecisionOther

Recent activity last 5

2026-05-31 21:02
OtherHandoff: course recording setup locked, next session builds the OBS scene + checklist
Closed the chat after locking the course-recording setup (full corner-cam; Q2U mic + C920S Renewed webcam being purchased; existing lamp + free teleprompter app + OBS/Clipchamp). Updated [HANDOFF.md](../../../HANDOFF.md) recording section to DECIDED and queued the OBS scene + record-day checklist as the first task next session.
2026-05-31 21:01
Decision[DECISION] Course recording setup locked (method + gear)
Recording method decided: full corner-cam (Chris on camera in the bottom-right webcam zone the decks already reserve, the whole course, plain shirt, 1-2 sessions). Gear chosen to buy: Samson Q2U dynamic USB-C/XLR mic ($99.99) and Logitech C920S Pro HD Webcam, Renewed ($52.44); total new spend ~$152. Light = existing adjustable lamp above the desk used on the white/neutral setting angled at his face ($0); teleprompter = free web teleprompter app on the second monitor he's buying separately ($0); software = OBS Studio (one-pass screen + webcam-corner + audio) + Clipchamp to edit (free). Ruled out: voice cloning (brand own-goal for an AI course) and the Blue Yeti (condenser picks up echo in the untreated ~200 sq ft room; the dynamic Q2U rejects it). Next session: build the OBS scene + record-day checklist, then pilot-record the intro + Module 1.
2026-05-31 19:29
OtherHandoff: four-door audience ladder + $39 pricing + promise line, written into the master plans
Strategy session that turned a brain dump into the going-forward frame: the business is one journey (fear to opportunity) at three altitudes / four product doors. Locked the promise to the "choice" framing ("AI leaves behind the people who ignore it and rewards the people who learn to direct it; I make you the second kind"), decided the Architect Method is a $39 feeder (real revenue on the Claude Code courses + agency + OS), and specced the four-door website (homepage self-select router; routes /architect-method, /claude-code, /agent-team, /os; courses-only LMS with agency + OS on separate rails). Wrote it all into [BUSINESS-PLAN.md](../../../BUSINESS-PLAN.md) (new Audience ladder + Website structure sections) and reconciled [LAUNCH-PLAN.md](../../../LAUNCH-PLAN.md) ($75-300 -> $39, courses-only scope) and [SYSTEM-VISION.md](../../../SYSTEM-VISION.md) (internal-systems-layer note); three docs kept separate. Pending Chris: pick final social bio wording + a later website-rebuild session.
2026-05-31 12:30
OtherAgentic OS initiative scoped (CortextOS teardown + plan)
Reverse-engineered agentic.james (James Goldbach) and his CortextOS multi-agent system via an 8-agent recon workflow plus screenshot/video analysis, and built the [agentic-os/](agentic-os/README.md) knowledge base (9 docs: teardown, whats-native-now, cost-model, build-roadmap, business-model, agency-crossover, vs-my-command-center, tools-and-open-questions, README). Key calls: ~80% is now native Claude Code so build only the glue (daemon + Telegram bridge + shared store + live dashboard); BYOK/metered always (the OpenClaw lesson); install-model distribution makes per-subscriber cost ~$0 and break-even ~2-3 subscribers; agentic OS is a compounding background build behind the agency + courses. Saved memory entry agentic-os-initiative.md; agency-dashboard crossover ideas (overnight brief, approvals queue, activity feed; Composio; cold-outreach add-on) staged for the agency session.
2026-05-30 09:40
OtherHandoff: Agency sales website rebuilt as an Ayla-inspired one-pager
Rebuilt the [/agency page](../../../site/src/pages/agency.astro) from a form-centric page into a full experiential one-pager modeled on the structure + motion of Ayla Bloomberg's site (Chris's reference exemplar), with all-original copy in Chris's voice and his indigo/near-black palette. Added a mouse-reactive dot grid, marquee, rotating hero line, staged phone chat mockup, an animated conveyor flow, and a dashboard mockup; trimmed the [intake form](../../../site/src/components/AgencyIntakeForm.astro) and added `headerStyle="none"` to [Layout](../../../site/src/layouts/Layout.astro) so it reads as a standalone product site. Decisions locked: no pricing, dashboard-led, 8 named agents, 24h proposal / 1-week live, "40+ hrs saved" claim. Files are local-only / untracked in the `site/` repo (not deployed). Also staged (not run) an [overnight research run](../../../research/2026-05-29-agency-sales-positioning/SCOPE.md) on how to sell a $500-$3,000 done-for-you AI automation service. Next chat: differentiate from Ayla, highlight higher value, polish copy/layout, then decide on deploy. Full bridge in [HANDOFF.md](../../../HANDOFF.md).